Excavation progress at the South Tower development site

The new South Tower, adjacent to the Dunsmuir Viaduct and the Rogers arena is progressing in the excavation. With a current depth of approximately 30 ft right next to the piers of the Dunsmuir Viaduct it shows an impressive image …

Vancouver South Tower – Rogers Arena – Update Read more »

Highly precise measurements of the Dunsmuir Viaduct measurement system are provided to Geopacific Consultants, the MMM Group and to the Aquilini Group to make sure that this critical infrastructure is not moving one millimeter while the construction and excavation is …

Dunsmuir Viaduct Construction Monitoring System Read more »

The Canadian Association of Earthquake Engineers (CAEE) is pleased to announce the 11th Canadian Conference on Earthquake Engineering, to be held July 21-24, 2015, in beautiful Victoria, British Columbia, Canada. The conference theme is “Facing Seismic Risk”, encompassing seismic hazards, …

11th Canadian Conference on Earthquake Engineering – July 21 – 24, 2015 Read more »

The Calgary Trail tunnel sensor installation has been completed and will provide the owner/operator 24/7 data from over 120 temperature channels, expansion joint displacement meters and 3D movement of tunnel sections. All sensors are connected wireless and have an estimated …

Calgary Trail Tunnel Instrumentation Read more »