Goethals Bridge Sensors go Online
Goethals Bridge Project goes live ! It took only 3 days on site to commission the complete system and to execute the field acceptance test (FAT) for 110 channels of.. read more
Goethals Bridge Project goes live ! It took only 3 days on site to commission the complete system and to execute the field acceptance test (FAT) for 110 channels of.. read more
Civionic Engineering has been contracted to develop ultra small, ultra precise and ultra low noise seismic sensors for our clients. As a new product in competition to the seismic sensor.. read more
The new South Tower, adjacent to the Dunsmuir Viaduct and the Rogers arena is progressing in the excavation. With a current depth of approximately 30 ft right next to the.. read more
Highly precise measurements of the Dunsmuir Viaduct measurement system are provided to Geopacific Consultants, the MMM Group and to the Aquilini Group to make sure that this critical infrastructure is.. read more
The Canadian Association of Earthquake Engineers (CAEE) is pleased to announce the 11th Canadian Conference on Earthquake Engineering, to be held July 21-24, 2015, in beautiful Victoria, British Columbia, Canada… read more
The Calgary Trail tunnel sensor installation has been completed and will provide the owner/operator 24/7 data from over 120 temperature channels, expansion joint displacement meters and 3D movement of tunnel.. read more