Skip to content Skip to footer

Post navigation

Civionic Engineering has been subcontracted to provide the structural health monitoring design Engineering services or the new Bataan Cavite Bridge in the Philippines.

The US$59 million contract was awarded to a joint venture of US-based TY Lin International and the Republic of Korea’s Pyunghwa Engineering Consultants.

The project is is being developed with funding from the Asian Development Bank (ADB).

The project involves the construction of a 32.15km, four-lane crossing of  Manila Bay from Barangay Alas-asin in Mariveles, Bataan, to Barangay Timalan in Naic, Cavite. The scheme includes two main structures – the North Channel Bridge and South Channel Bridge – with main spans of 400m and 900m, respectively.

We have completed the SHMS design in our Vancouver office and are proud o the work achieved in collaboration with TYLin and their team.

Post navigation

Sensor solutions for the Civil Engineering world…

Contact Information

Civionic Engineering & Consulting 2014 Inc.
342 -255 Newport Drive
Port Moody, BC
V3H 5H1
Canada

Phone: +1 (604) 655 4200

USA Address:

Civionic Engineering & Consulting 2014 Inc.
1685 H Street # 27971
Blaine WA 98230
USA

Phone: +1 (206) 260 0266

CLOUDTAGS
  • article
  • blog
  • design
  • ideas
  • interior
  • news
  • post
  • repair

© Copyright 2024 Civionic Engineering and Consulting (2014) Inc.

Subscribe for the updates!

Subscribe for the updates!